Project Details
Owner
Town of Snowmass Village
Location
Snowmass, Colorado
Delivery Method
Design-Bid-Build
Fiber Design (Phase 2)
This project builds on the previous Phase 1 municipal fiber project in order to provide last-mile fiber optic connections for Town infrastructure. The expanded network will ensure that the Town’s critical infrastructure can maintain reliable communications for day-to-day operations, as well as emergency situations. The project will also position the Town for implementation of future fiber to the premises (FTTX), intended to improve communications reliability and speed for both residential and commercial users. The IronStride team worked closely with the Town during
the design phase to ensure we were meeting both current and future needs. In addition to requiring creative solutions to address significant grade challenges and utility conflicts, our team was able to support the Town in
developing fiber optic standards. The Phase 2 fiber project was constructed in Summer 2024.
Services Included:




